Case study
New Data Center Development
Objective
The objective of this Assignment is to provide solution for new data center requirements, Installation and configuration of New Data Center & Migration for Existing Device. The project aims to create suitable and conditioned Data center and ICT / AV / Security systems in order effective management to support business activities and services
Our Product Solution
Electricity
- MDP - DC
- SDP-UPS
- PP-CRAC
- DB-UTILITY
- PDU - SERVER 1
- PDU - SERVER 2
Raised Floor
- Fiber Reinforced Calcium Sulphate
- Antistatic HPL Covering
- 600 x 600 mm x 32 mm
- 52,92 kN/m2
- 24,26 kN
Fire Suppression
- Utility Room
- Server Room
CCTV
- IP Dome Camera 4MP Indoor
- NVR 8Ch
Precision Air Conditioner
- Cooling System: Air Cooled System
- Air Discharge : Down Flow Air Discharge
- Cooling Capacity: 46.9 Kw
- System: Parallel Redundancy
Rack & Contaiment
- Rack 42U 600mm Wide x 1070mm Deep Enclosure with Sides Black
- Rack PDU 16A
- Rack PDU 32A
Environmental Monitoring Systems
- Monitoring power
- Temperature/Humidity Sensor
- Water Leak 10 Feet
- Alarm Beacon
UPS
- Power Capacity: 60 KVA
- Backup time: 15 Minutes Full load
- System: Parallel Redundancy
Contaiment
- Celling Panel Mounting Rail - 1800mm
- Celling Panel Mounting Rail - 300mm
- Celling Panel Mounting Rail - 100mm
- Celling Panel - 1200mm
- Celling Panel Lock
- Aisle Containment Door - Sliding
- Door Header - 42U
- Door Lock